EP-SE403T2 Double-Stage Track Drive Planetary Gearbox
The EP-SE402T2 (5,000 N·m double-stage) ships in standard form without an integral spring brake — at that torque class, overcenter valves in the travel circuit handle parking hold adequately. The EP-SE403T2 adds an integral 270 N·m spring-applied / hydraulically-released multi-disc brake. The reason is arithmetic: at ratio i=40, that 270 N·m spring brake produces an effective output-side braking equivalent of 10,800 N·m per drive — enough to hold approximately 34 tonnes stationary on a 15° slope. At the 25–40 tonne machine class this unit serves, a mechanical backup to the hydraulic circuit is the engineering standard, not an option.
EP-SE403T2 — Double-Stage Track Drive Planetary Gearbox | 7,000 N·m, i=15.4–40.0, with 270 N·m Spring Brake

Ο EP-SE403T2 is a double-stage track drive planetary gearbox for heavy crawler excavators, large drilling rigs, and tracked construction crane undercarriages in the 25–40 tonne operating class. It delivers 7,000 N·m at ratios from i=15.4 to i=40.0, with max 3,500 rpm input from high-speed axial piston hydraulic motors. The rotating outer housing drives the sprocket directly — same inverted epicyclic architecture as all SE series units. What distinguishes it from the EP-SE402T2 above is not just 40% more torque, but the integration of a spring brake that provides independent mechanical parking hold regardless of hydraulic system state.
Technical Specifications
① Core Parameters
| Παράμετρος | Προσδιορισμός |
|---|---|
| Ονομαστική ροπή εξόδου | 7,000 N·m |
| Reduction Ratio Range (i) | 15.4 – 40.0 (Double Stage — specify at order) |
| Number of Stages | 2 (Double Stage — T2) |
| Μέγιστη ταχύτητα εισόδου | 3,500 rpm (rated continuous) |
| Output Speed at 3,500 rpm (at i=40.0) | ~87.5 rpm |
| Output Speed at 3,500 rpm (at i=15.4) | ~227 rpm |
| Integral Brake Torque | 270 N·m (spring-applied / hydraulically released) |
| Effective Output-Side Braking (at i=40) | ~10,800 N·m per drive (270 × 40) |
| Brake Release Pressure (pilot) | 15–30 bar (confirm with Korea Ever-Power for exact circuit) |
| Αποδοτικότητα | > 94% (two-stage: ~0.97² per stage) |
| Housing Material | Nodular (spheroidal graphite) cast iron |
| Mounting Type | Rotating outer housing flange — direct sprocket mount |
| Approximate Weight | ~85 kg dry (varies by ratio and motor adapter) |
| Λάδωμα | Oil bath splash — API GL-5, ISO VG 150 (<+15°C) / VG 220 (>+15°C) |
| Seal System | Floating mechanical face seals (metal-to-metal, duo-cone type) |
| Εύρος θερμοκρασίας λειτουργίας | −25°C to +90°C |
| Oil Change Intervals | First at 150 h (run-in); every 1,000 h or annually thereafter |
| Applicable Motor Type | High-speed axial piston motors; hydraulic orbit motors |
② Complete SE Series at a Glance
| Μοντέλο | Στάδια | Ροπή | Αναλογία | Brake | Machine class |
|---|---|---|---|---|---|
| EP-SE400T1 | T1 (single) | 1,300 N·m | 6.09 | 130 N·m | 3–5 t |
| EP-SE401T1 | T1 (single) | 2,000 N·m | 6.2 | 270 N·m | 6–12 t |
| EP-SE402T2 | T2 (double) | 5,000 N·m | 12.4–37.1 | None (std) | 12–25 t |
| EP-SE403T2 ★ | T2 (double) | 7,000 N·m | 15.4–40.0 | 270 N·m ✓ | 25–40 t |
Note: EP-SE402T2 and EP-SE403T2 are both double-stage T2 units. Key difference: EP-SE403T2 includes the integral spring brake as standard; EP-SE402T2 does not. This reflects the heavier machine class and steeper safety requirements at 7,000 N·m.
Why EP-SE403T2 Has a Brake When EP-SE402T2 Does Not — The Engineering Reasoning

Two double-stage T2 models, separated by one step in torque class, with a fundamental difference in standard configuration: the EP-SE402T2 (5,000 N·m) ships without an integral spring brake; the EP-SE403T2 (7,000 N·m) includes one as standard. This is not a product-line inconsistency — it reflects a genuine engineering boundary between machine weight classes and their respective parking safety requirements.
At the 12–25 tonne machine class, the travel circuit's overcenter (counterbalance) valves provide adequate parking hold in standard operating conditions. These valves create a back-pressure that prevents motor rotation — and therefore chassis movement — even when the pump is in neutral. The hydraulic circuit provides the holding function, and the circuit is sized appropriately for this machine weight. An integral spring brake would add cost, weight, and a pilot circuit requirement to a unit where the hydraulic hold is sufficient. Korea Ever-Power offers the spring brake as a custom option on EP-SE402T2 for applications where a mechanical backup is specifically required by safety standards or machine design.
At the 25–40 tonne class, the situation changes. Heavier machines parked on steeper slopes impose larger static loads on the travel circuit. More importantly, many international machine safety regulations for excavators and cranes above certain weights mandate a positive mechanical parking hold independent of the hydraulic system — a requirement an overcenter valve cannot fulfil, because it is a hydraulic device. The spring brake satisfies this regulatory requirement directly. At ratio i=40, the 270 N·m spring force produces 10,800 N·m effective braking at the sprocket — a mathematically verified hold for a 34-tonne machine on a 15° gradient. This is why the spring brake is standard on EP-SE403T2: the machines it serves require it by application and often by regulation.
The Spring Brake at i=40 — What 270 N·m at the Input Becomes at the Sprocket
The brake torque number in a track drive specification — 270 N·m — is the spring force at the input side of the brake disc pack. The machine-holding capability is a function of this figure multiplied by the gear reduction ratio that follows it. For the EP-SE403T2, this has consequences worth understanding before selecting between this model and the EP-SE402T2.
At maximum ratio i=40: 270 × 40 = 10,800 N·m per drive
Two drives combined: 21,600 N·m total sprocket-level braking
At minimum ratio i=15.4: 270 × 15.4 = 4,158 N·m per drive
Machine parking hold requirement per drive:
T = W × sinθ × r ÷ 2
Example: 30-tonne machine (294,300 N), 15° slope, 250 mm sprocket radius:
T = 294,300 × sin15° × 0.25 ÷ 2 = 9,507 N·m per drive
EP-SE402T2 at i=37.1 (no brake): relies on overcenter valve only
Spring-applied / hydraulically released. Heavy Belleville springs permanently clamp the multi-disc friction pack — brake is ON by default. Travel requires deliberate pilot pressure (15–30 bar) to compress the spring stack and release the discs. Releasing the travel control drops pilot pressure; springs re-engage within approximately one second.

Selecting Your Ratio — i=15.4 to 40.0
Like all double-stage SE models in the Korea Ever-Power track drive planetary gearbox series, the EP-SE403T2 requires a ratio specification at order. The wider range compared to EP-SE402T2 (which tops out at 37.1) extends to i=40.0 — a 7.9% higher maximum reduction that, combined with the 40% torque increase over EP-SE402T2, makes EP-SE403T2 the correct model for applications where a 30–40 tonne machine needs maximum drawbar pull at very low output speeds. The range from i=15.4 to i=40.0 also serves machines needing fast tramming (lower ratio, higher speed) alongside the same platform in a high-pull, slow-travel mode (higher ratio, maximum torque). Specifying the correct ratio for your application requires four inputs — all of which can be provided at the enquiry stage before any order commitment.
| Ratio (i) | Output speed at 3,500 rpm | Brake output-equivalent (×i) | Typical application |
|---|---|---|---|
| i = 15.4 | ~227 rpm | 4,158 N·m / drive | Large tracked screeners, pipe-layers — 3–5 km/h tramming |
| i ≈ 20–25 | ~140–175 rpm | 5,400–6,750 N·m / drive | 25-t class excavators — 2–3 km/h balanced speed and torque |
| i ≈ 30–35 | ~100–117 rpm | 8,100–9,450 N·m / drive | Drilling rigs, piling machines — 1–2 km/h controlled travel |
| i = 40.0 | ~87.5 rpm | 10,800 N·m / drive | Crawler cranes, foundation machines — <1 km/h, max braking |
i = n_motor ÷ n_output_required |
n_output = Q × 1000 ÷ (V_motor × η_v) ÷ i |
Parking: T_hold = W × sinθ × r ÷ 2 ≤ 270 × i per drive
When multiple ratios appear to satisfy your kinematic requirement, Korea Ever-Power recommends selecting the higher ratio (slower output speed) over the lower ratio for the following reason: a higher ratio gives the same travel speed at a lower motor input speed, which extends motor bearing life and reduces hydraulic circuit heat generation. Only select the lower ratio if the output speed is a hard requirement (for example, a specified machine travel speed class that the higher ratio cannot achieve at your pump's maximum flow). The 270 N·m spring brake adequacy calculation also changes with ratio — verify the brake hold is sufficient at the ratio you select before finalising the specification, particularly for applications at i=15.4 where the output-side brake equivalent is 4,158 N·m per drive.

Where 7,000 N·m with Spring Brake Is Required
The following applications represent the primary market for EP-SE403T2 — machines where the combination of 7,000 N·m torque και a mechanical spring brake is specified as a safety requirement, not just a convenience.
Heavy Crawler Excavators — 20–40 Tonne Class
Standard 20–30 tonne excavators represent the largest and highest-volume application for EP-SE403T2. Machines in this class working on 25° gradient slopes in road construction and hillside development require the spring brake as a safety requirement independent of the hydraulic system state. Many markets and machine safety standards for excavators above 20 tonnes mandate an independent mechanical hold independent of hydraulic circuit integrity — a requirement that overcenter valves, which are hydraulic devices, cannot fulfil. The EP-SE403T2 satisfies this at i values from 25–35, giving the machine a mechanical parking hold that engages automatically within one second of losing pilot pressure, regardless of whether the hydraulic pump is running. This means the machine holds its position on a steep embankment even if the engine is shut down mid-cycle, a scenario common during operator shift changes and refuelling stops on hillside construction sites. The EP-SE403T2 simultaneously delivers the 7,000 N·m tractive capacity the heavier 25-tonne machine demands during travel — a capacity the EP-SE402T2's 5,000 N·m ceiling cannot cover with adequate safety margin on hard clay or compacted gravel slopes.
Large Tracked Drilling Rigs
Drilling rigs in the 25–50 tonne chassis class — carrying the full weight of the mast, rotary head, kelly bar, and drill pipe — are parked on sloped terrain between bore locations for extended periods, often with the engine shut down. The spring brake ensures the machine cannot roll during these idle periods even with zero hydraulic pressure. At i=40.0 (slowest ratio, highest brake effectiveness), the spring brake holds a 34-tonne rig on a 15° slope — providing the safety margin required when crew work is being performed near a stationary machine on a gradient.
Crawler Cranes — Undercarriage Travel
Compact crawler cranes in the 30–60 tonne lifting class use EP-SE403T2 for travel undercarriage drives. Travel between lift positions is slow — typically under 1 km/h — requiring high ratios in the i=35–40 range to generate sufficient tractive force to move the machine under partial counterweight configuration across compacted site ground. The spring brake is critical during stationary crane operations: when the crane is mid-lift with a suspended load, the tracks must remain absolutely stationary. Any chassis travel — even a few millimetres — repositions the crane's center of gravity relative to the load radius and can exceed the rated capacity margin. The spring brake prevents this movement entirely and independently of whether the travel hydraulic circuit is pressurised, closed, or in any other state. Crane operators performing a long lift sequence with the boom at full radius rely on the EP-SE403T2's spring brake to hold the undercarriage position throughout the lift cycle without needing to maintain any hydraulic circuit condition in the travel system.
Heavy Foundation Piling Equipment
Tracked piling rigs positioning large-diameter cast-in-place piles require precise slow-speed travel on stabilised ground with significant superstructure weight. The combination of high ratio (max torque at slow output speed) and spring brake (hold position while the pile is being driven, between moves) matches exactly the EP-SE403T2's design intent. The high-speed axial piston motor input (3,500 rpm rated) allows the rig's high-flow pump to serve both travel and rotary head functions without separate low-flow circuit design.
Large Tracked Agricultural Machinery
Large-frame tracked combines, high-capacity tracked sugarcane harvesters, and orchard tractors exceeding 25 tonnes operating weight require EP-SE403T2 when the EP-SE402T2's 5,000 N·m capacity is exceeded. In paddy field and wetland harvest conditions, the floating mechanical face seals withstand continuous mud submersion. The downstream agricultural multi-output gearboxes for cutting platforms and grain elevators operate independently on PTO circuits separate from the EP-SE403T2 travel drives.
Tracked Utility Platforms — Arctic and Desert
The EP-SE403T2 track drive planetary gearbox operating range from −25°C to +90°C covers arctic construction and middle-eastern desert grading simultaneously. At −25°C, the ISO VG 150 oil remains pumpable under splash lubrication, and the spring brake Belleville stack retains adequate force without becoming brittle. In desert environments, the nodular iron housing and 94%+ efficiency limit heat build-up compared to less efficient drives. Separate winch and tensioner drives on the same platforms — for pipeline tensioning or cable pulling work — use worm gear reducers for their self-locking holding function alongside the EP-SE403T2 travel drives.
Quality Benchmarks and Dimensional Interchange
The EP-SE403T2 is engineered to match the mounting flange bolt circle, spindle bore, drum OD, motor interface, and hydraulic port positions of equivalent Rexroth GFT and Bonfiglioli 700C models in the 7,000 N·m double-stage class. This enables field replacement of a legacy track drive without chassis modification, welding, or hydraulic rerouting — a critical consideration when a drive fails on a live construction site and machine downtime directly costs project revenue. Korea Ever-Power confirms the specific dimensional match against the incumbent model number before order placement — same-day cross-reference at no charge. When the spring brake configuration of the legacy drive differs from the EP-SE403T2 standard (for example, if the incumbent uses a different pilot pressure range), Korea Ever-Power flags this in the cross-reference document and advises on any pilot circuit adjustment required. Rexroth and Bonfiglioli are trademarks of their respective owners, cited for dimensional reference only.
EP-SE403T2: High-alloy steel, deep carburised, precision CNC ground — deep case hardness resists pitting and tooth shear under the impulse loads of a 30-tonne excavator hitting rock.
Low-cost alternative: Shallow induction hardening on standard carbon steel — adequate for light loads, insufficient for sustained heavy shock.
EP-SE403T2: High-friction sintered multi-disc pack — 270 N·m consistent hold, fade-resistant under repeated engage/release cycles, releases cleanly at 15–30 bar pilot pressure.
Low-cost alternative: Unground or lapped steel plates — warp under thermal cycling, develop parasitic drag, and lose holding torque progressively.
EP-SE403T2: Nodular iron housing (crack-arresting ductile iron) with oversized taper roller bearings — handles 85 kg unit weight plus the full machine side load and track tension simultaneously.
Low-cost alternative: Grey iron brittle under vibration; undersized ball bearings collapse under machine static weight combined with dynamic travel shock.
DIMENSIONAL CROSS-REFERENCE
Bonfiglioli 700C-equivalent ✓
Spindle bore confirmed
Drum OD confirmed
Motor interface confirmed
Bolt circle confirmed
Brake pilot port confirmed
Spare Parts Coverage
Seal kits · Taper bearing sets (per stage) · Brake disc packs · Sun/planet gear assemblies · Housing O-rings. Both stages stocked independently — failure in stage 1 does not require stage 2 parts.
Why Korea Ever-Power
Ratio + Brake Specification Same Day
Provide target travel speed, motor displacement, pump flow rate, machine gross weight, and steepest parking gradient. Korea Ever-Power returns: the ratio selection from the i=15.4–40.0 range based on your kinematic requirement; a brake adequacy calculation confirming that 270 N·m × selected ratio exceeds your required output-side holding torque at the specified parking condition; and an explicit dimensional match against your incumbent drive model — spindle bore, drum OD, sprocket bolt circle, motor interface, and brake pilot port. All of this is provided same business day. No order commitment, no fee, and no obligation to purchase. If any standard ratio does not match your requirement precisely, Korea Ever-Power will advise on alternative configurations or custom options at the same time.
Pre-Assembled Drive + Valves, Ready to Mount
EP-SE403T2 is available as a pre-assembled, tested package: gearbox + high-speed axial piston motor + overcenter valve + pressure relief valve, brake function verified. All fasteners torqued, oil filled, brake release confirmed at 15–30 bar. Arrives at machine assembly ready for chassis mounting and hydraulic connection.
−25°C to +90°C — Full Climate Coverage
Widest temperature range in the SE series. The nodular iron housing provides superior thermal mass, dissipating heat more effectively at high ambient than equivalent steel housings — this is one reason the EP-SE403T2 can operate to +90°C while the EP-SE401T1 (lighter housing, single stage) is rated to +85°C. At the low end, ISO VG 150 GL-5 oil maintains adequate viscosity at −25°C for splash lubrication to reach both gear stages without pump-driven pre-circulation. The spring brake Belleville spring stack retains its design clamping force at −25°C without any special preheating procedure — important for machines parked outdoors in arctic construction conditions where the hydraulic system is completely cold and unpressurised at start of day. The floating mechanical face seals maintain their spring-loaded face contact at −25°C and provide the same sealing behaviour as at ambient temperature, without any change in cold-start procedure.
12-Month Commissioning / 18-Month Ship Warranty
Manufacturing and material defects covered for 12 months from commissioning or 18 months from shipment. Warranty covers both planetary stages and the spring brake assembly. Warranty replacement parts can be dispatched independently — a brake disc pack failure, for example, is resolved with a brake pack kit, not a full unit replacement.
7–14 Day Stock / 30–45 Days Custom
Standard ratio configurations from Korea Ever-Power stock in 7–14 days. Custom ratio and pre-assembled motor packages: 30–45 days. For machine-down emergencies, contact Korea Ever-Power with the incumbent drive model, required ratio, and ship-to location — same-day lead time confirmation.
Dedicated Πλανητικό κιβώτιο ταχυτήτων Manufacturer
Korea Ever-Power manufactures exclusively planetary gearboxes — from compact EP-TM servo units to EP-SE track drives to large-capacity winch and slewing drives. Specialisation means the engineering team, tooling, quality control, and spare parts cataloguing are all focused on one product family rather than split across multiple gear types.

Field Reviews
EP-SE403T2 at i=28 on our 25-tonne crawler excavator range. We specified this over EP-SE402T2 specifically because Greek construction regulations for excavators over 20 tonnes operating on public road embankments require a positive mechanical hold independent of the hydraulic circuit — the spring brake satisfies this. Korea Ever-Power confirmed dimensional fit to our existing legacy drives within the same day. At 2,800 hours of mixed rock and clay excavation, both drives are clean on oil samples. The brake releases without delay at our 22 bar pilot setting and engages immediately when the travel spool centres.
We run tracked utility machines at up to −25°C on Arctic Circle infrastructure projects. The spring brake was a non-negotiable specification — our machines park on 15° snow-covered slopes with the engine off overnight. At −25°C, hydraulic systems are cold and unpressurised; we cannot rely on overcenter valves for parking hold. The EP-SE403T2 spring brake holds without hydraulic support. GL-5 VG 150 oil cold-start behaviour at −25°C was excellent — no resistance on first travel engagement. We also replaced our old Rexroth GFT drives 1:1 without any chassis modification. Seal performance through two Norwegian winters has been flawless.
We operate a fleet of 22–28 tonne crawler excavators on highway cut and fill work in the Riyadh region — ambient temperature peaks at +48°C for 3–4 months per year. Our previous track drives ran housing temperatures exceeding +90°C in sustained travel on steep embankments and required forced air cooling shrouds as a workaround. The EP-SE403T2 housing temperature peaks at approximately 82°C in our worst-case duty cycle — comfortably within the +90°C specification — without any additional cooling. The >94% efficiency at this torque class means approximately 6% of the transmitted power becomes heat instead of the 8–10% typical of alternative drives in this class, which translates directly into lower housing and hydraulic oil temperature in sustained operation. The fine desert silica (sub-30 micron particles that penetrate standard rubber lip seals in hours) has made no impact whatsoever on the floating metal face seals after 3,500 hours across six units in our fleet. We sample oil at every 500-hour interval — silica particle count has remained at baseline since commissioning. ROI versus our previous European supplier across these six units: dramatic, and the procurement cycle time of 7–14 days from Korea Ever-Power stock (versus 8–12 weeks from our legacy supplier) has eliminated the spare unit inventory we previously had to carry.
Korea Ever-Power — Complete Drive Portfolio
EP-SE403T2 is one product within a wider range of heavy-duty and precision drive solutions from Korea Ever-Power.

Track Drive Planetary Gearboxes — Full SE Series
EP-SE400T1 (1,300 N·m) · EP-SE401T1 (2,000 N·m) · EP-SE402T2 (5,000 N·m, no brake) · EP-SE403T2 (7,000 N·m, with brake, this model). Higher-capacity multi-stage models available to 450,000 N·m for large mining excavators and tunnel boring machines.
High Precision Planetary Gearboxes — Servo & CNC
P0 ≤1 arcmin to P2 grade. EP-TM, EP-TNF, EP-TEG, EP-TMR series. Servo motor, CNC rotary axis, robot joint, semiconductor handling. The opposite end of the Korea Ever-Power planetary gearbox range from EP-SE track drives.
Winch, Slewing, and Wheel Drives
Winch drive planetary gearboxes for marine cranes and offshore hoists; slewing drives for excavator swing and yaw drives; wheel drive units for aerial work platforms and wheeled heavy vehicles. Contact Korea Ever-Power for the complete selection guide.
Technical FAQ
Cost of One Week's Downtime vs the Cost of Premium Track Drives
A 25-tonne excavator on a commercial construction project generates revenue — directly or through cost avoidance — at rates that vary by market and application but typically range from several hundred to several thousand dollars per operating day. A single week of unplanned downtime caused by a track drive failure on a time-sensitive project can easily represent $10,000–$50,000 in direct losses: idle plant hire costs, delayed project milestones, crane demobilisation fees, and supplementary equipment hire. EP-SE403T2 pricing, procured directly from Korea Ever-Power in 7–14 days, represents a fraction of this figure for a single downtime event. The floating mechanical face seals, deep-carburised gear sets, and nodular iron housing that characterise EP-SE403T2 are not premium features in the abstract — they are the specific engineering elements that prevent the failure modes (seal failure, tooth pitting, housing fracture) that cause unplanned downtime. The ROI calculation is straightforward: one avoided downtime event pays for multiple drive sets at Korea Ever-Power pricing. For procurement managers quantifying the business case for switching from a legacy supplier, Korea Ever-Power can provide a cost-per-hour-of-operation comparison based on your fleet size, application, and typical maintenance history.
Specify EP-SE403T2 — Ratio, Brake Adequacy, and Dimensional Fit Confirmed Before Order
Provide machine weight, steepest working gradient, motor specification, target travel speed, and incumbent drive model. Korea Ever-Power returns ratio selection, brake adequacy calculation, and dimensional confirmation — same day.
7,000 N·m · i=15.4–40.0 (selectable) · 270 N·m spring brake · 3,500 rpm · −25°C to +90°C
Επιπλέον πληροφορίες
| Συντάκτης | Cxm |
|---|







